The forecast

The saved forecast predicted a road surface temperature of −2.4°C by 7am, below the 0°C trigger for preventative gritting.

The recorded visit

The crew attended shortly after midnight and logged the route as complete after 20 minutes. The visit report included a photograph and a GPS route with gaps where fixes were weak.

What the report shows

The facilities team had a timestamped completion record before the morning forecast low.